Gas Dehydration Units Tunu North Field

Project Description

EPC for:

  • 2 Contractor T/T 18m, ID 2,10m, WT 94 mm, Glass Flake Lined, 110 Tons Each
  • 2 Glycol Regeneration Modules, 15,500 mm Long X 6500 mm Width, 175 Tons Each 
  • 2 Filter Separator, T/T 1300, WT 43 mm, Glass Flake Lined, 82 Tons Each 
  • 5 GTS Platforms (GTS I,K,L,M, N) Associated Wellhead Platform Walkways & Tie Ins  Including Design & Supply for 5 Units etc Total Weight 8000 Tonnes
CATEGORY
Onshore

LOCATION:
East Kalimantan, Indonesia

OWNER/ CLIENT:
Total Indonesie

SERVICE:
Natural Gas 2 x 450 MMSCFD